| Intended use |
What the finished basement will be used for and what environmental
performance the design is intended to achieve.
|
Architectural drawings, room use, specification and relevant design requirements.
|
Architect and relevant specialist designers, with building control where applicable.
|
| Existing building, ground and water |
What is known about foundations, soil, groundwater, drainage,
neighbouring structures, services and other site constraints.
|
Surveys, trial pits, site investigation, groundwater information,
drainage records and existing-building information.
|
Structural engineer, geotechnical specialist, site investigator and other appointed advisers.
|
| Permanent structure |
How the completed basement structure works and which assumptions
the engineering design depends on.
|
Current structural drawings, calculations, specifications and design notes.
|
Appointed structural engineer.
|
| Excavation, sequence and temporary works |
How the building remains supported while ground is removed and
how the temporary condition changes as the permanent structure is constructed.
|
Construction methodology, sequence drawings, temporary-works briefs,
designs, checks and inspection arrangements.
|
Contractor, temporary-works designer and coordinator, structural engineer
and other relevant dutyholders.
|
| Waterproofing and drainage |
The design basis, proposed protection approach and how walls, floors,
joints, penetrations, drainage and maintainable components work together.
|
Waterproofing drawings, specification, structural details,
drainage information and maintenance requirements.
|
Appointed waterproofing designer together with the structural and other relevant designers.
|
| Scope and price |
What is included, excluded, provisional or dependent on an assumption,
and where responsibility moves from one party to another.
|
Quotations, schedules, clarifications, specifications,
tender documents and revision records.
|
Contractor, quantity surveyor, contract administrator and relevant designers as applicable.
|
| Planning, building control and neighbours |
Which approvals, notices, consents or third-party procedures are required
before the relevant work proceeds.
|
Planning documents, building-control information, Party Wall information
and any project-specific approvals or conditions.
|
Planning adviser or architect, building-control body, Party Wall surveyor
and other appropriate advisers.
|
| Handover and future maintenance |
What must be inspected, recorded, commissioned, serviced or kept accessible
after construction is complete.
|
Inspection records, commissioning information, operating instructions,
maintenance schedules and warranties.
|
Contractor, specialist installers, designers and the building owner as appropriate.
|